Lower Floor Plan
Footings have been Poured
Construction should be complete by July 2018
Unique design incorporates structural concrete silos
Side Section
Side Section Binder chemicals will be stored and mixed on 2nd floor
Front Section Raw materials feed from Concrete silos to Weigh hopper to Mixer
Bulk Materials can be loaded into silos from upper road. Cement can be loaded onto Volumetric Concrete Mixer trucks on ground floor
Navrattan-USA field testing facility under construction